Motorola SG 2000 Instrukcje Operacyjne Strona 41

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 53
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 40
Operation 5
55
5-
--
-5
55
5
AT&T SLW2500 Installation and Operation Manual
Table 5-5
SLW25-RPLR output levels
Typical Output
(dBmV)
dBm/mW Test Point
(volts)
45.0 2.0/1.6 1.6
43.0 1.0/1.3 1.3
41.0 0.0/1.0 1.0
39.0
1.0/0.8
0.8
37.0
2.0/0.6
0.6
35.0
3.0/0.5
0.5
Configuration
The following subsections describe your options in preparing the SLW2500 for service in the
distribution system.
Forward Path RF
For forward path operation, the SLW2500 lid motherboard (LIDB) houses a single optical
receiver, SG2-LR, in the receiver A position.
Forward Bandsplit Option
To use the forward bandsplit option, you must purchase an additional SG2-LR optical receiver
module and the SG2-FBS jumper board.
The broadband optical receiver module, SG2-LR, must be installed in the optical receiver A
position. The optional narrowcast optical receiver module, SG2-LR, must be installed in the
receiver B position. A forward bandsplit, SG2-FBS jumper board or JXP must also be plugged
into the LIDB. Figure 3-1 illustrates the location of the two SG2-LR receivers.
The SG2-LIDB distributes an RF signal from the receiver to the RF chassis as illustrated in
Figure 5-4:
Figure 5-4
Single receiver
Broadband
optical
receiver A
Optional
narrowcast
optical
receiver B
RF chassis
JXP
JXP
A
Optional
SG2-FBS
or
JXP-0
TP
-20 dB
TP
-20 dB
Przeglądanie stron 40
1 2 ... 36 37 38 39 40 41 42 43 44 45 46 ... 52 53

Komentarze do niniejszej Instrukcji

Brak uwag